Archives

Showing posts with label mike leinbach. Show all posts
Showing posts with label mike leinbach. Show all posts

Thursday, July 7, 2011

End of an Era: Weather Briefings and Communicating Uncertainty

By Carla Voorhees

Kathy Winters is an Air Force Civilian Meteorologist at the 45th Weather Squadron at Cape Canaveral Air Force Station. She is the Space Shuttle Launch Weather Officer providing weather support to the Space Shuttle Program at Kennedy Space Center (KSC) as the Launch Team prepares for the 8 July 2011 launch of Atlantis. You can find out more about the 45th Space Wing at their Facebook page.

We had two significant weather briefings Wednesday, 6 July: the 45th Space Wing Launch Readiness Review and the Shuttle Mission Management Team Launch minus 2-day meeting. Both meetings are essential to determine launch readiness, and weather is one piece of the large puzzle of things that must come together for launch. During these meetings, our squadron presents weather forecasts for the rotating service structure retract, tanking, solid rocket booster recovery, launch, plus 24- and 48- hour launch delay forecasts. Spaceflight Meteorology Group also presents the abort landing weather during the Shuttle Mission Management Team meeting. During the briefings, weather threats are highlighted so the Shuttle and Space Wing teams know what to expect. Sometimes NASA managers change the time of a pre-launch operation if the current schedule puts the launch countdown at risk for a weather delay, but the launch window itself is not modified since it is based upon the rendezvous with the International Space Station on-orbit.

After the Mission Management Team meeting, I attend a press conference with the Shuttle Launch Director, Mike Leinbach, and the Shuttle Launch Integration Manager, Mike Moses.  Our squadron Launch Weather Officers interact with them often since weather affects so many Shuttle operations. We provide a weather briefing to Mike Leinbach and his team every weekday morning to plan ground operations around the weather, if necessary. We increase the briefings to a few updates per day when a hurricane threatens the Florida East Coast. Mike Moses and Mike Leinbach have heard so many of my weather briefings that they can tell from the tone of my voice how certain or uncertain I am about a particular weather forecast. One NASA manager called this “Human Capital,” the rapport these managers build with their team which results in the synergy needed during a challenging situation, such as a Shuttle rollback decision.

Another way we describe the forecast confidence in a particular weather situation is through probability forecasts. For launch, we provide the “Probability of KSC Weather Prohibiting Launch,” as opposed to an absolute forecast. We also provide probabilities for constraint violations during ground operations.  In fact, many Shuttle constraints include probabilities, such as for Shuttle rollout, the constraint is “no more than a 10% chance of lightning within 20nm.” If you view our weekly planning forecast, you will see the probability of precipitation and lightning our customers use for planning purposes. These probability forecasts help launch teams make cost/risk decisions.

Speaking of probabilities, Wednesday, we increased our probability of KSC weather prohibiting launch. Weather does not look good for Friday here on the Florida Space Coast! Check out our latest launch forecast.  Hopefully we’ll be able to launch Friday—check out the photo that shows you the view of the Shuttle launch from our building!
Read More >>

Wednesday, July 6, 2011

Launch Weather Forecast Remains 30 Percent "Go" for Friday

Following a meeting of the Mission Management Team this morning, STS-135 countdown and weather updates were provided at prelaunch news conference. Panelists included Mike Moses, Mission Management Team chair and space shuttle launch integration manager, Mike Leinbach, shuttle launch director, and Kathy Winters, shuttle weather officer.

"We had a really smooth Mission Management Team meeting today," said Moses. "The vehicle is in fantastic shape." In regard to the launch-day weather forecast, he added, "Before we go load the propellants into the tank we'll take a look at the weather and make sure it's really a good day to try that, and so at that point we'll be making a decision"

"The countdown so far is going extremely well," reported Leinbach. "We're not tracking anything at all that would prevent an on-time liftoff Friday morning."

"We have a tropical wave that's out in the Caribbean," explained Winters. "That wave is actually going to come into Florida along with a lot of tropical moisture that's down to the south, and it's all going to roll into Florida in the next couple of days." Based on these conditions, Winters predicted an 80 percent chance of weather preventing tanking operations, with a 70 percent chance of it standing in the way of launch at 11:26 a.m. on Friday.

The countdown for this final space shuttle launch began yesterday at 1 p.m. This morning at the T-27 hour mark, the countdown entered a planned hold at 5 a.m. and resumed at 9 a.m.

The Atlantis astronauts awoke at 4:30 a.m. to continue their preparations for launch.
Read More >>

Countdown Continues Toward Friday's Launch

The countdown for the final space shuttle launch began yesterday at 1 p.m. EDT, starting at the T-43 hour mark. However, the weather forecast looks less than favorable for Friday's launch, with only a 30 percent chance of a "go" at the 11:26 a.m. liftoff time.

At the 10 a.m. precountdown status briefing yesterday, NASA Test Director Jeremy Graeber reported space shuttle Atlantis is ready for flight, and STS-135 payload manager Joe Delai said the payloads are ready to go as well. The only issue standing in the way of liftoff is the chance of showers and thunderstorms developing along the sea-breeze front reported by Kathy Winters, shuttle weather officer.

Today's prelaunch news conference will begin at 11:30 a.m. EDT live on NASA TV and online at www.nasa.gov/ntv. Participants will be Mike Moses, Mission Management Team chair and space shuttle launch integration manager, Mike Leinbach, shuttle launch director, and Kathy Winters, shuttle weather officer.
Read More >>

Tuesday, June 28, 2011

Managers Say Atlantis is "Go" for Launch

After the day-long Flight Readiness Review at NASA's Kennedy Space Center in Florida, senior NASA and contractor managers voted unanimously to set space shuttle Atlantis' STS-135 launch date as July 8 at 11:26 a.m. EDT.

NASA Television will air a news conference at 3:30 p.m. to discuss the meeting and preparations for Atlantis' mission to the International Space Station. Participants will include Bill Gerstenmaier, assistant administrator for space operations, Mike Moses, Space Shuttle Program launch integration manager and Mike Leinbach, shuttle launch director.

Watch the news conference at www.nasa.gov/ntv.
Read More >>

Wednesday, June 1, 2011

Endeavour Lands For Final Time at 2:34 a.m. EDT

Space shuttle Endeavour landed for the final time at NASA’s Kennedy Space Center after 248 orbits around Earth and a journey of 6,510,221 miles on STS-134.

Endeavour’s main gear touched down at 2:34:51 a.m. followed by the nose gear at 2:35:04 and wheels stop at 2:35:36 a.m.

A post-landing news conference with managers at Kennedy is expected no earlier than 4:30 a.m. on NASA Television and http://www.nasa.gov/ntv. The participants will be Bill Gerstenmaier, associate administrator for Space Operations, Mike Moses, space shuttle launch integration manager, and Mike Leinbach, space shuttle launch director.

STS-134 was the 25th and final flight for Endeavour, which spent 299 days in space, orbited Earth 4,671 times and traveled 122,883,151 miles.

Space shuttle Atlantis now is about half way complete with its move from NASA Kennedy Space Center's Vehicle Assembly Building to Launch Pad 39A.

Currently, the crawler-transporter (CT) with Atlantis and its mobile launcher platform on top is temporarily stopped to allow technicians to preemptively grease some bearings in the CT that were starting to heat up. The rollout will resume shortly.

Atlantis is expected to be secured on the launch pad about 3:30 a.m. EDT.
Read More >>

Tuesday, May 31, 2011

Space Shuttle Endeavour Returns to Earth for Final Time Wednesday

Joshua Buck
Headquarters, Washington                                   
 
Candrea Thomas
Kennedy Space Center, Fla.
 
CAPE CANAVERAL, Fla. -- Space shuttle Endeavour is scheduled to return to Earth for the final time on Wednesday, June 1, completing a 16-day mission to outfit the International Space Station. If Endeavour lands Wednesday, it will have spent 299 days in space and traveled more than 122.8 million miles during its 25 flights. It launched on its first mission on May 7, 1992.

Wednesday's landing opportunities at NASA's Kennedy Space Center in Florida are at 2:35 a.m. and 4:11 a.m. EDT. Endeavour's entry flight control team led by Tony Ceccacci will evaluate weather conditions at Kennedy before permitting Endeavour to land. If the shuttle is unable to return Wednesday, additional opportunities are available on Thursday at Kennedy and at backup landing site Edwards Air Force Base in California. For recorded updates about landing, call 321-867-2525.

Approximately two hours after Endeavour lands, NASA officials will hold a briefing to discuss the mission. The participants will be:
-     Bill Gerstenmaier, associate administrator for Space Operations
-     Mike Moses, space shuttle launch integration manager
-     Mike Leinbach, space shuttle launch director

After touchdown, the astronauts will undergo routine physical examinations and meet with their families. The crew is expected to participate in a post-landing news conference about six hours after landing. Availability is subject to change due to real time circumstances. The news events will be broadcast live on NASA Television and the agency's website.

The Kennedy Press Site will be open for shuttle Atlantis’ rollout to Launch Pad 39A scheduled for 8 p.m. Tuesday and will remain open until 4:30 p.m. Wednesday.

News media representatives who have been approved for STS-134 mission badges but have not picked them up yet may do so at NASA's Pass and Identification Building on State Road 3 on May 31 from 4 - 6 p.m. and 10:30 p.m. to 12:30 a.m. on June 1. The last bus will depart from the news center for the Shuttle Landing Facility one hour before landing.

If the shuttle landing is diverted to Edwards after Wednesday, reporters should call the public affairs office at NASA's Dryden Flight Research Center at 661-276-3449. Dryden has limited facilities available for previously accredited journalists.

The NASA News Twitter feed is updated throughout the shuttle mission and landing. To follow, visit http://www.twitter.com/nasa.

For NASA TV downlink information, schedules and links to streaming video, visit http://www.nasa.gov/ntv.

For the latest information about the STS-134 mission and accomplishments, visit http://www.nasa.gov/shuttle.

For more information about the space station and its crew, visit http://www.nasa.gov/station.

- end -
Read More >>

Tuesday, May 17, 2011

A Great Launch, A Challenging Mission Ahead

Space shuttle Endeavour is officially on its way to the International Space Station on its STS-134 mission and final flight. Endeavour lifted off from NASA's Kennedy Space Center on time at 8:56 a.m. EDT, soaring through a few clouds, after a relatively smooth countdown.

"I can't thank the teams that got this vehicle ready to fly and for all the work they've done," said Associate Administrator for Space Operations Bill Gerstenmaier referring to the Auxiliary Power Unit (APU) heater issues and said, "The teams worked really hard to get through that, get it behind and to understand what the problem was -- and it was no problem to us at all during the count."

"The teams stayed focused, and made this launch a success," Gerstenmaier added. "The mission in front of us is no easy mission, the EVAs (extra vehicular activities) are very demanding -- but it'll be exciting to see the AMS (Alpha Magnetic Spectrometer) get installed on the station and get some real research data for the ISS."

"We showed our determination to succeed on a very complex mission," said Michel Tognini, head of the European Astronaut Center and former ESA astronaut, "and this is the model of human exploration for the future."

Mike Moses apologized (in jest) about the view not being the best and the longest because of the cloud cover." But the data that we were looking at in the launch center was absolutely perfect," said Moses. "We had the clouds where we needed them, so we went."

There were a few minor problems, but they were managed and worked immediately, including the minor tile repair, reported Moses.

After every launch an award is given to one of the teams, according to Shuttle Launch Director Mike Leinbach, and today's honor was given to the combined APU repair/test team. "It was an outstanding countdown, lots of pats on the back in the lobby of the LCC (launch control center) afterwards when we were eating our beans and corn bread (a traditional post-launch snack)," said Leinbach. "Endeavour's on orbit safely and it's going to perform a great mission and we'll see her back here on June 1."

"It's a great day here at Kennedy Space Center and for the Shuttle Program," added Leinbach.
Read More >>

Sunday, May 15, 2011

Shuttle MMT Green Lights Continuing Endeavour Countdown

The shuttle Mission Management Team is giving space shuttle Endeavour’s launch team the green light to continue the countdown for Monday’s 8:56 a.m. EDT liftoff. The MMT met this afternoon at NASA’s Kennedy Space Center in Florida and reviewed how launch preparations for Endeavour’s STS-134 mission are progressing.

During a news conference on NASA Television following the MMT, Shuttle Launch Director Mike Leinbach said the countdown is going extremely well and the team is ready to go.

The forecast still calls for a 70 percent chance of acceptable weather at launch time.

On Kennedy’s Launch Pad 39A, the rotating service structure is scheduled to be moved away from Endeavour starting at noon on Sunday. Endeavour’s external fuel tank is scheduled to be filled beginning at 11:36 p.m. Live NASA TV fueling commentary will begin at 11:30 p.m.
Read More >>

Teams Not Working Any Launch Issues, Post-MMT News Conference at 4 p.m. Eastern

Launch teams at NASA’s Kennedy Space Center are working through the countdown milestones with no issues that would delay space shuttle Endeavour’s launch Monday, May 16 at 8:56 a.m. EDT to the International Space Station. The countdown entered an 8-hour built-in hold at 11 a.m. at T-19 hours and will pick up again at 7 p.m. Technicians at Launch Pad 39A have completed loading cryogenic reactants into Endeavour’s fuel cell storage tanks. Teams will remove the orbiter mid-body umbilical unit, which was used to load the propellants into the power reactant distribution system later this afternoon.

Current forecasts still call for a 70 percent chance of acceptable conditions at launch time.

The Mission Management Team will meet at 3 p.m. MMT chair and Space Shuttle Launch Integration Manager Mike Moses, Shuttle Launch Director Mike Leinbach and Shuttle Weather Officer Kathy Winters will hold a news conference at 4 p.m. live on NASA TV and www.nasa.gov/ntv.
Read More >>

Monday, May 9, 2011

NASA Sets May 16 For Final Space Shuttle Endeavour Launch

Stephanie L. Schierholz
Headquarters, Washington     
 
Kyle Herring
Johnson Space Center, Houston
 
Candrea Thomas
Kennedy Space Center, Fla.

CAPE CANAVERAL -- NASA managers have set the liftoff of space shuttle Endeavour for 8:56 a.m. EDT on Monday, May 16. Launch attempts are available through May 26, except for May 21. The STS-134 mission to the International Space Station is the penultimate shuttle flight and the final one for Endeavour.

Space Shuttle Program Launch Integration Manager Mike Moses and Shuttle Launch Director Mike Leinbach announced the date at a news briefing Monday from NASA's Kennedy Space Center in Florida. They also discussed the progress of repairs since Endeavour's launch postponement on April 29.

A short in the heater circuit associated with Endeavour's hydraulic system resulted in the launch postponement. Technicians determined the most likely failure was inside a switchbox in the shuttle's aft compartment and associated electrical wiring connecting the switchbox to the heaters. The heater circuits prevent freezing of the fuel lines providing hydraulic power to steer the vehicle during ascent and entry.

The faulty box was replaced May 4. Since Friday, Kennedy technicians installed and tested new wiring that bypasses the suspect electrical wiring and confirmed the heater system is working properly. They also are completing retests of other systems powered by the switchbox and are closing out Endeavour's aft compartment.

STS-134 Commander Mark Kelly and his five crewmates are set to arrive at Kennedy for prelaunch preparations on Thursday, May 12, at approximately 11 a.m. NASA Television will broadcast the crew's arrival live. For NASA TV streaming video, downlink and scheduling information, visit http://www.nasa.gov/ntv.

The crew will deliver the Alpha Magnetic Spectrometer-2 (AMS) and critical supplies to the space station, including two communications antennas, a high-pressure gas tank and additional parts for the Dextre robot. AMS is a particle physics detector designed to search for various types of unusual matter. The crew also will transfer Endeavour's orbiter boom sensor system to the station, where it could assist spacewalkers as an extension for the station's robotic arm. For the latest information about the shuttle mission and its crew, visit http://www.nasa.gov/shuttle.

- end -
Read More >>

NASA Managers Meet to Discuss Endeavour's Launch

NASA managers have retargeted space shuttle Endeavour's launch to no earlier than Monday, May 16. After a meeting on Friday, they also extended the length of Endeavour's STS-134 mission to the International Space Station from 14 to 16 days. If Endeavour launches on May 16, liftoff would be at 8:56 a.m. EDT.

At 3 p.m. today, NASA Space Shuttle Program Launch Integration Manager Mike Moses and Shuttle Launch Director Mike Leinbach will hold a news conference at Kennedy Space Center in Florida to discuss the progress of repairs since Endeavour's launch postponement on April 29. The news conference will air live on NASA Television and online at www.nasa.gov/ntv.

Over the weekend, Kennedy technicians installed and checked out new wiring that bypasses the suspect electrical wiring connecting the switchbox to the heaters. They also ran the heaters for up to 30 minutes to verify they are working properly and complete retesting of the other systems powered by the switchbox. Teams will begin closing out Endeavour's aft compartment and will begin launch countdown preps today.
Read More >>

Sunday, May 8, 2011

Space Shuttle Endeavour to Launch No Earlier Than May 16

NASA managers have retargeted space shuttle Endeavour's launch to no earlier than Monday, May 16. After a meeting on Friday, they also extended the length of Endeavour's STS-134 mission to the International Space Station from 14 to 16 days. If Endeavour launches on May 16, liftoff would be at 8:56 a.m. EDT.

At 3 p.m. on Monday, May 9, NASA Space Shuttle Program Launch Integration Manager Mike Moses and Shuttle Launch Director Mike Leinbach will hold a news conference at Kennedy Space Center in Florida to discuss the progress of repairs since Endeavour's launch postponement on April 29. The news conference will air live on NASA Television and online at www.nasa.gov/ntv.

Kennedy technicians are continuing work to resolve an issue in a heater circuit associated with Endeavour's hydraulic system that resulted in the launch postponement. Technicians determined the failure was inside an aft load control assembly, which is a switchbox in the shuttle's aft compartment, and possibly its associated electrical wiring.

Although the root cause of the failure in the switchbox has not been found, technicians are replacing hardware that could have caused the problem. The faulty box was changed Wednesday, and a test of nine shuttle systems powered by the new box is under way.

This weekend, technicians will install and check out new wiring that bypasses the suspect electrical wiring connecting the switchbox to the heaters. They also will run the heaters for up to 30 minutes to verify they are working properly and complete retesting of the other systems powered by the switchbox.

The shuttle has three Auxiliary Power Units (APUs) that provide hydraulic power to steer the vehicle during ascent and entry. The hydrazine fuel lines on each APU have two heater circuits that prevent the fuel from freezing while the shuttle is in space. NASA launch commit criteria and flight rules require all APUs and heater circuits to be operational for launch. On Endeavour's first launch attempt, one of two heaters for APU-1's fuel line did not work. Engineers confirmed the circuit in the original switchbox that directed power to the heaters was shorted out.

Launch attempts are available through May 26. May 21 is the only day a launch is not an option because it would lead to a May 23 docking with the space station. May 23 is when three of the space station's Expedition 27 crew members undock and return home in their Soyuz spacecraft. Managers reviewed the STS-134 mission timeline and determined the Endeavour crew can accomplish all objectives even with the departure of the three station crew members.
Read More >>